Updated: Development: Commercial Building, Lekki Phase 1 - Lagos
Research . 6 years ago
commercial
contractor
formwork
lekki phase 1
office
premium
property
real estate
Share this post
Subscribe to our newsletter
Name: Commercial Building; Location: Admiralty Way, Lekki Phase 1 - Lagos; Contractor: Formwork Limited; Developer: Private; Architect: Project Development Team; Size: 5,000m2 Floor plate: c. 1,000m2 (including common areas); Floors: 4; Structural Engineer: Olatunji Abisoye & Associates; Mechanical and Electrical Consultant: OJ&T Consulting; Mechanical and Electrical Engineer: Megawatts Limited; Expected Completion: H2:2017. Updated: January 2018. This modern and aesthetic 4-floor…
- Name: Commercial Building;
- Location: Admiralty Way, Lekki Phase 1 – Lagos;
- Contractor: Formwork Limited;
- Developer: Private;
- Architect: Project Development Team;
- Size: 5,000m2
- Floor plate: c. 1,000m2 (including common areas);
- Floors: 4;
- Structural Engineer: Olatunji Abisoye & Associates;
- Mechanical and Electrical Consultant: OJ&T Consulting;
- Mechanical and Electrical Engineer: Megawatts Limited;
- Expected Completion: H2:2017.
- Updated: January 2018.
This modern and aesthetic 4-floor office development with dual accessibility from both Admiralty Way and Layi Yusuf Crescent in Lekki Phase 1 is finally nearing completion.
The building has an estimated gross leasable area of 5,000m2 and a typical floor plate is around 1,000m2 including communal areas. Each floor is designed with a flexible configuration of office spaces that allows single and multi-tenant options. The building also comprises floor to ceiling windows made with energy efficient tinted glass.
The ground floor to 3rd floor all share a similar layout, while the fourth/pent floor includes a mezzanine floor that is accessible via two staircases. The pent floor also opens up to a terrace.
The ground floor will comprise two receptions, with turnstile access for the respective entrances to the building and there will be parking spaces provided in front of both entrances. A 100 bay car park is also provided on a nearby site on Layi Yusuf Crescent.
See photos below.
Related News
You will find these interesting
Bisi Adedun . December 08, 2023
The Quadrant was initially designed to be the Lekki Phase 1 CBD as part of a serene residential neighborhood. However, a...
admiralty way
Central Business District
Bisi Adedun . November 14, 2023
Africa Investment Forum
AIF
Bisi Adedun . November 08, 2023
housing
personal finance